Skip to main content

Table 2 Test results for the control beams and the beams reinforced with welded wire mesh.

From: Applying the Ferrocement Concept in Construction of Concrete Beams Incorporating Reinforced Mortar Permanent Forms

Specimen

Volume fraction

Mortar and concrete compressive strength (MPa)

First crack load (kN)

Serviceability load (kN)

Ultimate load (kN)

Deflection at first crack (mm)

Deflection at ultimate load (mm)

Energy absorption (kN mm)

Mortar

Concrete

Samples

Average

Samples

Average

Samples

Average

Samples

Average

Samples

Average

Samples

Average

C1

   

20

20.0

44.73

45.6

66.25

65.9

1.60

1.59

21.00

21.1

1087.51

1101

C2

N/A

38

20

45.99

68.00

1.68

22.45

1201.76

C3

   

20

45.95

63.50

1.50

19.96

1012.45

WSC1

   

30

31.7

49.03

51.6

87.25

86.3

2.65

2.82

17.95

20.4

1146.65

1330

WSC2

0.0065

40

40

30

50.29

83.00

2.92

18.89

1141.15

WSC3

   

35

55.51

88.50

2.90

24.49

1701.66

WDC1

   

40

40.0

48.54

52.8

105.25

102.9

4.08

3.75

28.45

25.0

2255.62

1946

WDC2

0.0130

58

41

40

59.99

102.00

3.10

18.88

1420.03

WDC3

   

40

49.99

101.50

4.07

27.60

2160.85

WSB1

   

28

28.0

43.00

40.0

70.00

70.6

3.19

3.53

10.26

11.1

415.50

450

WSB2

0.0065

41

42

28

36.42

71.75

3.95

12.18

491.66

WSB3

   

28

40.55

70.00

3.44

10.95

441.33

WSS1

   

32

32.0

53.28

51.9

82.00

84.3

2.59

2.74

20.30

20.47

1280.60

1303

WSS2

0.0065

48

41

32

55.19

83.75

2.38

23.00

1525.60

WSS3

   

32

47.17

87.20

3.26

18.10

1103.54

WSR1

   

35

31.7

52.78

51.4

81.25

88.4

2.89

2.78

20.26

20.0

1282.80

1304

WSR2

0.0065

46

35

30

51.68

92.00

2.70

19.21

1278.80

WSR3

   

30

49.74

92.00

2.76

20.50

1350.49