Skip to main content

Table 5 Top 1 in. chlorides for CoP specimens after 6 months (1 in. = 25.4 mm).

From: Laboratory Evaluation of Select Methods of Corrosion Prevention in Reinforced Concrete Bridges

Specimen #

Treatment

Average  %Cl− in top 1-in.

Average index for  %Cl− in top 1-in.

1 and 2

TSZ

0.124

0.87

3 and 4

TSZ w/EP-C

0.071

0.36

5 and 6

EA-A w/A-C

0.256

2.10

7 and 8

EA-A

0.293

2.44

9 and 10

EA-B

0.426

3.69

11 and 12

T-SS

0.044

0.11

13

A-C

0.213

1.70

14

EP-C

0.032

0.00

15 and 16

Control

0.224

1.80