Skip to main content

Table 1 Proposals for fiber content to be investigated.

From: Investigation of Fiber Distribution in Concrete Batches Discharged from Ready-Mix Truck

 

Average of 3 samples

Any individual sample

Proposal I

Minimum 90 % of specified fiber content.

No maximum

Minimum 85 % of specified fiber content.

No maximum

Proposal II

Minimum 85 % of specified fiber content.

Maximum 115 %

Minimum 80 % of specified fiber content. Maximum 120 %