From: Investigation of Fiber Distribution in Concrete Batches Discharged from Ready-Mix Truck
Truck load no. | Start | Middle | End | Average | % of added |
---|---|---|---|---|---|
1 | 81.0 | 71.0 | 74.0 | 75.3 | 107.6 |
2 | 63.0 | 65.0 | 75.0 | 67.7 | 96.7 |
3 | 84.0 | 75.0 | 72.0 | 77.0 | 110.0 |
4 | 83.0 | 79.0 | 73.0 | 78.3 | 111.9 |
5 | 70.0 | 63.0 | 76.0 | 69.7 | 99.5 |
6 | 79.0 | 75.0 | 69.0 | 74.3 | 106.2 |
7 | 98.0 | 78.0 | 70.0 | 82.0 | 80.0 |
8 | 82.0 | 76.0 | 82.0 | 80.0 | 114.3 |
Average | 80.0 | 72.8 | 73.9 | 75.5 | 107.9 |
Portions of the amounts added to batch | 114.3 % | 103.9 % | 105.5 % | 107.9 % | 107.9 % |