Skip to main content

Table 4 Influence of SPs on the setting time.

From: Hydration Behaviors of Portland Cement with Different Lithologic Stone Powders

SP

Performance

Percentage content (%)

0

5

10

15

20

30

LP

Initial setting time (min)

176

158

178

176

177

176

Final setting time (min)

223

210

226

226

233

235

Normal consistency (%)

25.8

25.8

26.0

26.4

26.6

27.2

QP

Initial setting time (min)

175

174

185

185

178

180

Final setting time (min)

238

238

247

250

241

238

Normal consistency (%)

25.8

26.0

26.4

26.6

26.8

27.4

GP

Initial setting time (min)

175

192

199

191

194

190

Final setting time (min)

220

225

229

223

229

235

Normal consistency (%)

25.8

26.0

26.2

26.6

26.8

27.4