From: Structural Performance Evaluation of a Precast PSC Curved Girder Bridge Constructed Using Multi-Tasking Formwork
Load step
Load (kN)
Deflection (mm)
L/4
2L/4
3L/4
G1
G2
Design load
450
7.7
7.8
11.3
11.7
7.3
7.74
Cracking load
1400
28.4
27.64
40.5
43.8
27.2
27.58
Max. load
3350
90.3
87.18
139.9
141.2
88.5
87.26