Fig. 4From: Methodology for Testing Rebar-Concrete Bond in Specimens from Decommissioned StructuresPilot tests with improved strengthening method at the suspension holes. Left: specimen without initial damage, after structural testing. Right: specimen with initial corrosion damage including cover spalling, upon failure.Back to article page