Skip to main content

Table 2 Information of the backfill conditions for field case studies.

From: Mechanical Response of Barricade to Coupled THMC Behavior of Cemented Paste Backfill

 

Field case 1

Field case 2

Binder content (%)

8.5 (0–8 m)

4 (0–6 m)

6.5 (8–15 m)

2 (6–32 m)

Filling rate (cm/h)

23

50

Filling strategy

Continuous fill

Continuous fill

Barricade size (m)

5.6 (height)

0.3 (thickness)

8.5 (extent)

5.8 (height)

0.3 (thickness)

  1. The reference studies (Thompson et al. 2009, 2010).