Fig. 10

The relationship between water absorption and 7-day UCS of the CSM with different cement dosage: a 2% cement dosage; b 3% cement dosage; c 4% cement dosage; (5) 5% cement dosage.
The relationship between water absorption and 7-day UCS of the CSM with different cement dosage: a 2% cement dosage; b 3% cement dosage; c 4% cement dosage; (5) 5% cement dosage.