Skip to main content

Table 4 Loading procedures for specimens under incremental and repeated tensile loadings.

From: Mechanical Performance and Stress–Strain Relationships for Grouted Splices Under Tensile and Cyclic Loadings

  1. F ys is the loaded force corresponding to the yield strength of the connected bars.