Fig. 7From: Methodology for Testing Rebar-Concrete Bond in Specimens from Decommissioned StructuresThe geometry of the cross-section (according to the original drawings) and two different cross-sections of the edge beams. The remaining part of the cut-off bridge slab is clearly visible to the right. Dimensions are in mm.Back to article page