Fig. 5From: Mass Concrete Placement of the Offshore Wind Turbine Foundation: A Statistical Approach to Optimize the Use of Fly Ash and Silica FumeMass placement of the offshore wind turbine foundation (a Pouring fresh concrete to the foundation, b the foundation after 5 days of temperature monitoring).Back to article page