Fig. 4From: Structural Behavior of Construction Joints in a Composite Rigid-Frame BridgeChemical anchor construction process: a hole drilling and anchor bolt insertion, b epoxy injection and curing, c inserting steel and fastening anchor bolts, d connection of steel girder and pierBack to article page